Transport and handling of various stages (Stage 1 with liquid propellant, Stage II with liquid propellant, transtage, solid motors, and structural frames) is examined; space vehicle in Saturn V program will be assembled on its LUT in vertical assembly building (VAB), checked out, and delivered to launch pad; should operation prove economical, similar technique will be used for future large vehicles; barges will be used to transport liquid stages, solid motors, tools, cargo, and other structures too large for transportation over rail or road; hoisting devices to be used.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Factory-to-launch transport and handling of future large launch vehicles


    Weitere Titelangaben:

    SAE -- Paper


    Beteiligte:
    Teague, B.M. (Autor:in)

    Kongress:

    SAE Meeting ; 1963 Ground equipment



    Erscheinungsdatum :

    1963


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Future of large launch vehicles

    Stone, J.W. | Engineering Index Backfile | 1963


    FUTURE OF LARGE LAUNCH VEHICLES

    Stone, J. W. | NTRS | 1963


    FUTURE OF LARGE LAUNCH VEHICLES

    STONE, JOHN | AIAA | 1963


    Large launch vehicles - Present and future

    Crawford, R. G. / Lucas, W. R. | NTRS | 1969