Five-mile length of track is being equipped with twin conductors to prove wiggly-wire system; communication system proposed has two conductors, one of which is straight and other laid in zig-zag pattern; at each signal position wires are broken and carrier signal of 40 khz is injected into wires in direction of oncoming traffic; information required by train includes traffic information, route information, and train information; development of prototype equipment will take place at Derby during next year, making full use of 5-mi length of zig-zag conductor which has just been laid between Derby Friargate and Etwall.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Full-scale trial for inductive train communication


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 123 , n 18 ; p 695-697 + 700


    Erscheinungsdatum :

    1967


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Union inductive train communication system

    Grondahl, L.O. | Engineering Index Backfile | 1944


    Union inductive train communication system

    Grondahl, L.O. | Engineering Index Backfile | 1944


    Union inductive train communication system

    Grondahl, L.O. | Engineering Index Backfile | 1944


    SNCB trials with inductive train communication

    Engineering Index Backfile | 1969


    Inductive train control

    Spies, R. | Engineering Index Backfile | 1929