Liege-Welkenraedt route involved heavy engineering work and provides through electrified services; difficulties were encountered due to enlargement of many tunnels to provide electrical clearances for overhead line; line has 20 tunnels and 23 bridges; tunnel length varies from 635 to 43 m; brick tunnel linings were removed and replaced by concrete blocks; illustration of traveling formwork; one tunnel was opened into cut; reconstructed line will have speeds reaching 160 km/hr.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electrification completed of direct Belgian-German route


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 122 , n 17


    Erscheinungsdatum :

    1966


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Banana line electrification completed

    Tietze, C. / Maier, W. | Tema Archiv | 1982


    Bay ridge electrification completed

    Engineering Index Backfile | 1928


    Electrification of 700 miles completed

    Stead, A.L. | Engineering Index Backfile | 1926


    Staten island railway electrification completed

    Butcher, C.A. | Engineering Index Backfile | 1925