Private 73 mi line built for Erie Mining Co through Minnesota will bring 7 1/2 million tons of taconite pellets yearly to lake port; 8 million yd of excavation required for construction; ore trains are composed of 96 specially designed cars, each of which carries 85.1 long tons; fully loaded train will carry 8170 long tons of pellets.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lay Taconite Railroad


    Weitere Titelangaben:

    Excavating Engr


    Erschienen in:

    Erscheinungsdatum :

    1957


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Taconite pellet handling at Lorain, Ohio

    Boyce, A.J. / Pirozzi, J. | Tema Archiv | 1982



    The motor yacht taconite -- Royal Vancouver Y. C. fleet

    Warren, G.B. | Engineering Index Backfile | 1930


    Development of high performance asphalt mastic using fine taconite filler

    Moon, Ki Hoon / Falchetto, Augusto Cannone / Park, Joo Young et al. | Online Contents | 2014


    Development of high performance asphalt mastic using fine taconite filler

    Moon, Ki Hoon / Falchetto, Augusto Cannone / Park, Joo Young et al. | Springer Verlag | 2014