Construction of 370 ft steel plate girder temporary bridge, for one way traffic, on complex earthmoving job to reduce long truck haul to fast moving scraper operation; solution eliminated haul route through heavy traffic and 160,000 truck trips through city streets; steel was obtained from dismounted old highway bridge; spans were designed to utilize given girder length, allowing certain overlappings.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Temporary bridge shortens Haul


    Weitere Titelangaben:

    Construction Methods Equipment


    Erschienen in:

    Erscheinungsdatum :

    1959


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Mirror adjustment shortens wavelengths

    British Library Online Contents | 1999



    Southern pacific shortens line in Texas

    Engineering Index Backfile | 1926


    Moving Block Shortens JLE Headway

    Studiengesellschaft für den kombinierten Verkehr e.V. | IuD Bahn | 1997


    Correcting brake faults shortens stops significantly

    Petring, F.W. | Engineering Index Backfile | 1955