Construction of Grevelingen dike by means of aerial cableway equipped with continuously circulating self-propelled cars; rock dump is loaded at 240 m long monorail loading station into nylon nets or tipping buckets suspended from cars; each of 12 cars traveling over two-span 1260 m long double cableway weighs 30 tons including 10 to 14 tons material; 300 hp diesel engine propels car at 4 to 9 m/sec and drives hoisting and dumping mechanism; dumping capacity of 350 tph/car was easily attained.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    L'Execution de la digue de Grevelingen, etc


    Weitere Titelangaben:

    L'Execution de la digue de Grevelingen, etc


    Beteiligte:
    Papault, R. (Autor:in)

    Erschienen in:

    Genie Civil ; 142 , n 17 ; p 326-332


    Erscheinungsdatum :

    1965


    Format / Umfang :

    7 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Verkenning Grevelingen water en getij

    Nieuwkamer, R. / Turlings, L. / Slager, J.-W. et al. | British Library Online Contents | 2009



    L'execution parallele accelere les gros calculs

    British Library Online Contents | 2008