As means for increasing track capacity and reducing train time, Seaboard has installed centralized traffic control on single track main line south from Savannah, Ga, to Thalmann; details of installation. (See also Ry Signaling v 36 n 5 May 1943 p 256-63)
Centralized traffic control installed on 64.6 miles of Seaboard
Ry Age
Railway Age ; 114 , n 20
1943
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control installed on 64.6 miles of Seaboard
Engineering Index Backfile | 1943
Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Centralized traffic control installed on alton
Engineering Index Backfile | 1934
Centralized traffic control installed on wabash
Engineering Index Backfile | 1931