Outstanding features of installation on 37 mi. of single track line between LaFayette Junction, Ind., and State Line; track layout and traffic; despatcher's machine 93 mi. from distant end of 37 mi. single-track installation; operating savings justify cost; special signal requirements; power-supply system. (see also Ry. Age, vol. 91, no. 2, July 11, 1931, pp. 50-52, 3 figs)
Centralized traffic control installed on wabash
Ry. Signaling
Railway Signaling ; 24 , n 7
1931
6 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control installed on wabash
Engineering Index Backfile | 1931
Engineering Index Backfile | 1941
Centralized traffic control installed on Burlington
Engineering Index Backfile | 1934
|Centralized traffic control installed on Alton
Engineering Index Backfile | 1934
Centralized traffic control installed on alton
Engineering Index Backfile | 1934