Salvage work required 18 mo of preparatory work, most of which was accomplished under water; salvage required: removal of three top decks, removal of all partitions, furniture and other inflammable material, closing 16 cargo ports and 356 air ports, removal of about 10,000 cu yd of mud, closing all promenade deck openings, closing all pipe lines in vessel leading from one compartment to another, installing 93 salvage pumps, with capacity of 155,000 gpm.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Refloating S.S. "Normandie,"


    Weitere Titelangaben:

    Eng News-Rec


    Beteiligte:
    Hunt, H.W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1943


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    REFLOATING DEVICE

    KOZYUKOV LEONID VIKTOROVICH / BURNYASHEV ALEKSANDR ALEKSANDROVICH / PYSHNYJ ALEKSANDR RUSLANOVICH | Europäisches Patentamt | 2017

    Freier Zugriff

    Refloating of ships

    Luise, E. | Engineering Index Backfile | 1965


    The refloating of ships

    Pierron, H. | Engineering Index Backfile | 1905


    refloating apparatus of submerged vessel

    Europäisches Patentamt | 2017

    Freier Zugriff

    System for refloating grounded vessels

    PIRTLE JAMES | Europäisches Patentamt | 2016

    Freier Zugriff