Naval ships over 300 ft long are built on assembly line using preassembled sections delivered by revolving gantry cranes operating on tracks transverse to direction the ship travels; as construction advances, vessels are moved sideways on 4-wheel buggies with hydraulic jacks to lower ships on permanent blocking at seven different berths; at end of 625-ft assembly line, vessel is lowered on timber sleds and launched sideways.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Production line shipbuilding with preassembled sections


    Weitere Titelangaben:

    Eng News-Rec


    Erschienen in:

    Erscheinungsdatum :

    1943


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Preassembled traction mechanism drive

    ULLEIN THOMAS / THIAM RACINE / HUSS MONA | Europäisches Patentamt | 2015

    Freier Zugriff

    American "production-line" shipbuilding

    Engineering Index Backfile | 1942


    Ground rod device with preassembled hanging ring

    ZHANG XIAOLE / YAO ZHIGUO / BYUN JUNG-TAEK et al. | Europäisches Patentamt | 2024

    Freier Zugriff


    The deflection of shipbuilding sections

    Borner, W. | Engineering Index Backfile | 1928