Great Northern decided to lay new track in panels instead of employing conventional methods to achieve speed in constructing 15 1/2 mi freight line to new Air Force base at Glasgow, Mont; track panels were preassembled in 33-ft and 39-ft lengths; each was complete with ties, rails, tie plates and joint bars, latter being loosely bolted in pairs to one end; method enabled road to lay 6000 ft of track per day. (See also Ry Track and Structures v 54 n 11 Nov 1958 p 17-19)
When track is laid in panels
Ry Age
Railway Age ; 145 , n 19
1958
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
Shinkansen slab track to be laid on earthwork
IuD Bahn | 1996
|Shinkansen Slab Track to be Laid on Earthworks
British Library Online Contents | 1996
SHINKANSEN SLAB TRACK TO BE LAID ON EARTHWORKS
Online Contents | 1996
Intelligent replenishment trolley driving system without laid track
Europäisches Patentamt | 2020
|