Snow melting on toll plaza of Chicago Calumet Skyway accomplished by circulating heat transfer oil through pipe coils in pavement slab; pavement 22 lanes wide, has melting facilities extending 200 ft for southbound plaza, 154 ft for northbound; system covers 58,500 sq ft of pavement and is designed for snow melting load of 9,580,000 Btu per hr; service building located beneath pavement slab.
New toll plaza snow melting system keeps skyway traffic moving
Heating, Piping Air Conditioning
Heating, Piping and Air Conditioning ; 30 , n 9
1958
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Traffic Monitoring and Analysis At Toll Plaza
IEEE | 2021
|Toll Plaza Merging Traffic Control for Throughput Maximization
Online Contents | 2010
|Toll Plaza Merging Traffic Control for Throughput Maximization
British Library Online Contents | 2010
|