Quick method for making qualitative cost analyses, using capital recovery factor; it is suggested that economic study, as aid in ship design, is best made in two stages; parametric analysis aimed at determining optimum ship, and determination of probable degree of profitability of chosen ship; table shows alterations in predicted optimum speed and capital recovery factor resulting from inaccuracies in cost analysis; it is concluded only four of major cost factors have any effect on optimum speed.
Short cuts in ship cost studies
Mar Eng
Marine Engineering ; 64 , n 4
1959
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ship Check cuts inspection time
British Library Online Contents | 2000
Online Contents | 1994
British Library Online Contents | 2007
Texas plant cuts handling cost
Engineering Index Backfile | 1950
|Where mechanical handling cuts cost
Engineering Index Backfile | 1930
|