Freight yard opened at St Luc, Montreal, replaces existing yards of Outremont, Sortin, and Hochelaga; hump retarder yard with 75 mi of track, equipped with push button control; terminal consists of three major yards, as well as storage and repair tracks; diagram shows layout. (see also Ry Gaz v 93 n 23 Dec 8 1950 p 516-9; Engineering v 170 n 4431 Dec 29 1950 p 553-5)
Canadian Pacific builds new yard
Ry Signaling Communications
Railway Signaling and Communication ; 43 , n 11
1950
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian yard builds large offshore rig for north sea use
Tema Archiv | 1975
Canadian pacific railway unit yard Montreal
Engineering Index Backfile | 1950
|Michigan Central builds large classification yard
Engineering Index Backfile | 1920