Freight yard opened at St Luc, Montreal, replaces existing yards of Outremont, Sortin, and Hochelaga; hump retarder yard with 75 mi of track, equipped with push button control; terminal consists of three major yards, as well as storage and repair tracks; diagram shows layout. (See also Ry Signaling and Communications v 43 n 11 Nov 1950 p 712-9; Ry Gaz v 93 n 23 Dec 8 1950 p 516-9)
Canadian Pacific builds new yard
Engineering
Engineering ; 170 , n 4431
1950
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian Pacific builds new yard
Engineering Index Backfile | 1950
Canadian yard builds large offshore rig for north sea use
Tema Archiv | 1975
Canadian pacific railway unit yard Montreal
Engineering Index Backfile | 1950
|Michigan Central builds large classification yard
Engineering Index Backfile | 1920