Locomotives are sent to repair depots for heavy repairs at intervals of from 16 mo to 5 yr, depending on class of engine; engine passes through standard procedure, course of repair being controlled by Locomotive Progress Organization; internal distribution of locomotives; repair time schedules; distribution of progress inspectors; boiler, wheel, and tender repairs.
Locomotive repairs at Swindon Works, Western Region
Ry Gaz
Railway Gazette ; 92 , n 19
1950
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Locomotive building and repair operations at Swindon works, great western railway
Engineering Index Backfile | 1920
Locomotive building and repair operations at Swindon works, great western railway
Engineering Index Backfile | 1920
Swindon locomotive, carriage and wagon works of the great western railway
Engineering Index Backfile | 1931
Automatic locomotive tyre boring at Swindon works, G.W.R.
Engineering Index Backfile | 1931
Engineering Index Backfile | 1952