Methods used at Western Region testing station of British Railways at Swindon and on road; stationary plant tests; procedure known as Summation of Increment Method evolved at Swindon plant; controlled road testing.
Locomotive testing at Swindon
Engineering
Engineering ; 174 , n 4510
1952
4 pages
Diagrams
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Locomotive testing plant at Swindon
Engineering Index Backfile | 1905
Swindon-built diesel hydraulic locomotive
Engineering Index Backfile | 1960
|Locomotive repairs at Swindon Works, Western Region
Engineering Index Backfile | 1950
Automatic locomotive tyre boring at Swindon works, G.W.R.
Engineering Index Backfile | 1931
Locomotive building and repair operations at Swindon works, great western railway
Engineering Index Backfile | 1920