On route to Los Angeles, Calif, Union Pacific has completed installation of centralized traffic control on 324.5 mi of single track between Salt Lake City, Utah, and Caliente, Nev, which is connected at Caliente with similar installation extending to Daggett, Calif, 300.9 mi, completed in 1943, so that entire 625.4 mi, in one continuous section, is operated by signal indication under CTC control. (See also Ry Age v 127 n 27 Dec 31 1949 p 1167-9)
Union Pacific equips 625-mile line with C.T.C.
Ry Signaling Communications
Railway Signaling and Communication ; 42 , n 12
1949
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Engineering Index Backfile | 1944
Engineering Index Backfile | 1953
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Engineering Index Backfile | 1945
Southern Pacific installs C.T.C.
Engineering Index Backfile | 1947