Facilities installed to speed up freight handling for Canadian Pacific Railway; yardmaster has control panel capable of handling 80 2-way loudspeakers and microphone for orders to speaker stations located at switchmen's positions along principal lead tracks and at local yard offices, roundhouse, icehouses, scales, coal dock, coach yard, and busiest industrial sidings.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Canadian Pacific yard system at Winnipeg speeds up train movements


    Weitere Titelangaben:

    Telegraph Telephone Age


    Beteiligte:
    Maunder, J.W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1950


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    New classification yard at Winnipeg

    Engineering Index Backfile | 1913


    C.P.R. installs yard loudspeakers at Winnipeg, Man

    Jones, V.C. | Engineering Index Backfile | 1949


    Canadian Pacific builds new yard

    Engineering Index Backfile | 1950



    Canadian Pacific speeds car tracing

    Engineering Index Backfile | 1950