Improved punctuality and timings are significant features of return to normal conditions; improvements made possible mainly by encouraging staff, improved methods of working, elimination of unnecessary delays and removal of speed restrictions; with arrival of additional new and powerful locomotives, obsolete engines will be replaced, and further improvement in engine reliability, performance, and speed is expected.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Post-war progress of Bengal-Nagpur railway


    Weitere Titelangaben:

    Ry Gaz


    Beteiligte:
    Bahl, P.C. (Autor:in)

    Erschienen in:

    Railway Gazette ; 92 , n 25


    Erscheinungsdatum :

    1950


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Bengal-Nagpur Railway Bridges

    Engineering Index Backfile | 1889


    Express engine, Bengal-Nagpur railway

    Engineering Index Backfile | 1903



    New all-steel wagons for Bengal-Nagpur Railway

    Engineering Index Backfile | 1921


    The new yard at Khargpur, Bengal-Nagpur Railway

    Engineering Index Backfile | 1916