To eliminate expense of joint maintenance and to realize other savings, Elgin, Joliet and Eastern Railway installed 5 1/2 mi of 131-lb continuous welded rail, joined by oxyacetylene pressure butt welds; longest rail in installation is 3503 ft long and shortest 410 ft long; welding set up, method of distributing rail, its installation and costs, are discussed. Before Maintenance of Way Club, Chicago.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    E.J. and E. Lays 5 1/2 miles of welded rail


    Weitere Titelangaben:

    Ry Eng Maintenance


    Beteiligte:
    Campbell, F.G. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1944


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Lehigh valley lays 5 miles of 66 ft. Rails

    Engineering Index Backfile | 1930


    North western lays 6 1/2 miles of transite pipe

    Engineering Index Backfile | 1937


    Missouri pacific lays rail with small gangs

    Engineering Index Backfile | 1937


    Kansas City southern lays 78-ft. rail

    Reece, A.N. | Engineering Index Backfile | 1937