Economic and transportation factors which led to building of new port warehouses; design and construction of 6-story reinforced concrete structure, 211 m. by 38 m., founded on wooden piles; structural details, fire protection and materials-handling equipment; total cost of construction 4,900,000 marks.
New warehouse sheds for general cargo in the seaport of stettin
Ein neuer Schuppenspeicher fuer Stueckgut im Seehafen Stettin
V.D.I. Zeitschrift ; 73 , n 41
1929
8 pages
20 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
New cargo-handling equipment of seaport Dordrecht
Engineering Index Backfile | 1930
|Schifffahrt & Häfen - Cargo handling: Innovative seaport technologies
Online Contents | 2008