Service given from Geneva to Saalfelden 472 mi.; total of 542 mi. will be completed by Summer of 1929; Salzburg-Vienna line, 193 mi. long, being considered; capital and amortization charges 10 per cent; electrification speeds up freight service to steam passenger speeds; experts differ with regard to Salzburg-Vienna change; how cost estimates vary from manufacturers' figures; estimate for electrification between Salzburg and Vienna; freight locomotive design in use on Mittenwald Railway; concrete towers used to carry high-tension transmission line.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Austro-Swiss electrification


    Weitere Titelangaben:

    Elec. Ry. Jl


    Erschienen in:

    Erscheinungsdatum :

    1929


    Format / Umfang :

    7 pages


    Anmerkungen:

    7 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Swiss railway electrification

    Engineering Index Backfile | 1930


    Interesting Swiss electrification

    Engineering Index Backfile | 1932


    Electrification of Swiss railways

    Huber-Stockar, E. | Engineering Index Backfile | 1919


    Swiss State railways electrification

    Engineering Index Backfile | 1920


    Electrification of Swiss federal railways

    Engineering Index Backfile | 1929