Brief reference to article in Oct. 11, 1929, issue of this journal mentioning alterations made to Graf Zeppelin after forced landing; problem was mainly one of altering frequency, or critical speed, of system; Bibby coupling, of form shown was tested; coupling has steel grid spring as its resilient member; couplings similar to test coupling were fitted to all five drives, and airship made its flight round world free from engine-vibration troubles.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Propeller-shaft failures of the "Graf Zeppelin"


    Weitere Titelangaben:

    Engineering


    Erschienen in:

    Engineering ; 129 , n 3339


    Erscheinungsdatum :

    1930


    Anmerkungen:

    2 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Graf Zeppelin

    Engineering Index Backfile | 1929


    Graf Zeppelin

    Rummel, Walter | TIBKAT | 1914


    Airship Graf Zeppelin

    Lehmann, A. | Engineering Index Backfile | 1930


    Airship Graf Zeppelin

    Lehmann, A. | Engineering Index Backfile | 1930


    Airship "Graf Zeppelin."

    Engineering Index Backfile | 1938