Account of suburban and main-line electrification scheme; route mileage equipped is 181.4 mi and length of track, including sidings, 571 mi; total capacity of plant installed in 15 substations is 100,000 kw and that in generating station 40,000 kw. (See also - (discussion) p 431-4; Instn Elec Engrs -- J v 71 n 432 Dec 1932 p 911-51 (discussion) p 951-7 1 supp plate; Engineer v 153 n 3982 May 6 1932 p 508-9)
Electrification of suburban and certain main-line sections of great indian peninsula railway
Inst Transport -- J
Institute of Transport -- Journal ; 13 , n 8
1932
21 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of suburban and certain main-line sections of Great Indian Peninsula railway
Engineering Index Backfile | 1932
|Electrification of suburban and certain main-line sections of great indian peninsula railway
Engineering Index Backfile | 1932
|Electrification of bombay suburban lines Great Indian Peninsula Railway
Engineering Index Backfile | 1923
Electrification of Bombay suburban lines, great Indian Peninsula Railway.
Engineering Index Backfile | 1925
Main line electrification on the great Indian Peninsula railway
Engineering Index Backfile | 1929