Electrified zone extends from Bombay to Poona on southeast line and from Bombay to Igatpuri on northeast line, distance of 204 mi.; power is generated at steam station near Kalyan, which has total plant capacity of 40,000 kw.; details of transmission lines, substations, overhead equipment, permanent way, and electric locomotives. (See also Engineer vol. 148, no. 3853, Nov. 15, 1929 pp. 512-515, 12 figs)
Main line electrification on the great Indian Peninsula railway
Ry Gaz
Railway Gazette and Railway News ; 51 , n 19
1929
6 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of the great Indian Peninsula Railway
Engineering Index Backfile | 1925
Electrification of bombay suburban lines Great Indian Peninsula Railway
Engineering Index Backfile | 1923
Electrification of Bombay suburban lines, great Indian Peninsula Railway.
Engineering Index Backfile | 1925
New articulated main line carriage, Great Indian Peninsula Railway
Engineering Index Backfile | 1923
Main line railway electrification
Engineering Index Backfile | 1924
|