Use of machine welding to prefabricate rail for Rimutaka Tunnel and approaches; rail on each side of weld is held between two elements carrying high amperage and low voltage and heated; two photoelectric cells measure heat by color of metal; 351-ft lengths of tunnel track were lifted from flat cars by series of transverse gantries spanning width of tunnel and running on rail 8 ft 10 in. apart; welded approach rails are 117 ft or 126 ft in length.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rail welding and methods of laying in New Zealand


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Railway Gazette ; 108 , n 15


    Erscheinungsdatum :

    1958


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Methods and costs of laying rail

    Morrow, George W. | Engineering Index Backfile | 1923


    REMOTE RAIL TRACK LAYING DEVICE AND REMOTE RAIL TRACK LAYING METHOD

    MAEDA YUJI / HOZUMI HISASHI / TOKUNAGA YASUAKI et al. | Europäisches Patentamt | 2016

    Freier Zugriff

    Laying rail in winter

    Engineering Index Backfile | 1925


    Cutting, Laying, Welding

    Dipl.-Ing. Knorra, Ulrich | Springer Verlag | 2017

    Freier Zugriff

    Rail laying with small ramps

    Engineering Index Backfile | 1929