It is suggested that design of entire ship and all its equipment should be aimed at not less than 12 mo guaranteed trouble-free operation without any lubrication, maintenance, repairs or replacements, and only minimum of cleaning, adjustment or attention; design must also aim at maximum simplicity; specialized equipment must be backed up by worldwide service and repair-by-replacement facilities.
Ship maintenance and associated design problems -- Cargo liners and cargo tramps
Roy Instn Naval Architects -- Quarterly Trans
Royal Institution of Naval Architects -- Quarterly Transactions ; 107 , n 3 ; p 305-308 + 320-340
1965
21 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
Engineering Index Backfile | 1940
|Online Contents | 2010
|Engineering Index Backfile | 1966
Engineering Index Backfile | 1947
|