Various automatic train operation tests are reviewed and related problems reported; problems discussed include coordination of control system with signal system, psychological reactions of passengers traveling by unmanned train, equipment necessary at stations to check that trains really stopped at platforms, and automatic speed control implying control of motorman or autopilot so that train does not run faster than actual signal indication permits.
Barcelona, Leningrad, Moscow, Nagoya, New York, Paris, Stockholm, Tokyo -- Eight cities test automatic train operation
Ry Signaling Communications
Railway Signaling and Communications ; 57 , n 8
1964
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
Riga's 200 km/h EMU ready for Moscow-Leningrad line
Tema Archiv | 1975
|Test apparatus and method of Automatic Train Operation for train
Europäisches Patentamt | 2023
|