Despite unusual technical difficulties encountered during expansion of West German section between Thionville and Coblenz, navigable section 271 km long was completed within seven years and was officially inaugurated in May 1964; principles of overall development project are described and essential data are given; project included construction of 14 dams with total fall of 89.9 m, five outer basins, and 40 m wide ship channel.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of Moselle River as large shipping waterway


    Weitere Titelangaben:

    Der Ausbau der Mosel zur Grosschiffahrtsstrasse


    Beteiligte:
    Schwarz, J.S. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1964


    Format / Umfang :

    7 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Deutsch


    Schlagwörter :


    Improvement works on Moselle (river)

    Vadot, R. | Engineering Index Backfile | 1960



    Xijiang river waterway shipping monitoring system based on Beidou satellite

    ZHANG JING / ZHANG ZENGFANG / LI SUQIAO | Europäisches Patentamt | 2016

    Freier Zugriff