Despite unusual technical difficulties encountered during expansion of West German section between Thionville and Coblenz, navigable section 271 km long was completed within seven years and was officially inaugurated in May 1964; principles of overall development project are described and essential data are given; project included construction of 14 dams with total fall of 89.9 m, five outer basins, and 40 m wide ship channel.
Development of Moselle River as large shipping waterway
Der Ausbau der Mosel zur Grosschiffahrtsstrasse
VDI -- Zeitschrift ; 106 , n 19
1964
7 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Improvement works on Moselle (river)
Engineering Index Backfile | 1960
|LOCOPIAS strengthens inland waterway shipping
Online Contents | 2014
Xijiang river waterway shipping monitoring system based on Beidou satellite
Europäisches Patentamt | 2016
|Rethinking: Technical development trends in inland waterway shipping
British Library Online Contents | 1999
Rethinking: Technical development trends in inland waterway shipping
Online Contents | 1999