During 1900-14 rubble bottoming and piles for reclamation scheme extending about 5000 ft were placed, and dredging also carried out; up to 1918 new quays were built with floating sheer legs, but after 1920 caisson method was adopted; berths and channel were deepened; shipbuilding and repair flourished; trade has changed, and heavy lifting gear and transit sheds were added; harbor police and fire inspectors enforce security; further development is planned. From paper before Roy Instn Naval Architects, June 5 1962.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Developments in port of Dublin, 1903-1962


    Weitere Titelangaben:

    Shipbldg Shipg Rec


    Beteiligte:
    Twohig, A.J.O. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1962


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Developments in port of Dublin, 1903-1962

    Twohig, A.J.O. | Engineering Index Backfile | 1962


    Port Developments at Dublin - Capacity - Competition - Port Charges

    Jones, J. F. | British Library Conference Proceedings | 1994


    Port of Dublin

    Kane, A. | Engineering Index Backfile | 1943


    The port of Dublin

    Engineering Index Backfile | 1929