Phase 1 of major reconstruction scheme at Cammell Laird's shipyard at Birkenhead is now complete; new drydock, named Princess Dock, is 950 ft long, has entrance width of 140 ft and is 148 ft wide in barrel; other major works include new shops for handling large prefabricated sections for shipbuilding, reconstruction of jetty, re-craning with 2 100-ton electric traveling cranes, extension of shipbuilding berths, tanker cleaning berth, etc.
Cammell Laird's Dock for super tankers
Engineering
Engineering ; 193 , n 5010
1962
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
South shields dry dock for super tankers
Engineering Index Backfile | 1956
South shields dry dock for super tankers
Engineering Index Backfile | 1956
Online Contents | 1999
Cammell Laird completes conversion
Online Contents | 2010
Cammell Laird secures MOD contract
Online Contents | 2008