History of shipbuilding on River Lee, connecting Lower Harbor with river port of Cork, which has gravitated between new building and repair work; repair work was ultimately focused on drydock at Rushbrooke dockyard for both shipbuilding and repairs; planning and construction of new yard is discussed with particular reference to problems of establishing new industry in predominantly rural area; training program for completely untrained labor force is described. From paper before Roy Instn Naval Architects.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of shipbuilding in Cork Harbour


    Weitere Titelangaben:

    Engineer


    Beteiligte:
    Martin, P.G. (Autor:in)

    Erschienen in:

    Engineer ; 214 , n 5554


    Erscheinungsdatum :

    1962


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :