Experience of lines west of Buffalo in stabilizing 36,379 ft of track during last 4 yr, employing pneumatic method and relatively rich sand-cement grout, and small, flexible crews, 16 of which are being organized for work to be done during 1945; results cited show unstable conditions completely overcome, with savings over former maintenance costs and elimination of speed restrictions due to soft track. (See also Railway Eng and Maintenance v 41 n 5 May 1945 p 474-8, 488)
Roadbed grouting slashes maintenance of soft track on New York Central
Ry Age
Railway Age ; 118 , n 18
1945
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Roadbed grouting returns large profits
Engineering Index Backfile | 1949
Engineering Index Backfile | 1945
Track and roadbed for high-speed trains
Engineering Index Backfile | 1945
|