Description of section from Hampton Court Junction to Portsmouth, and line from Woking to Alton; length of converted track amounts to 242 mi; electric energy for operation obtained on 3-phase system at 33 kv and frequency of 50 cycles from Central Electricity Board's substations at Working and Portsmouth; coach work generally similar to those used on other parts of system. (see also Engineering v 144 n 3729 July 2 1937 p 10-2 and 14)
Electrification of southern railway to Portsmouth
Engineer
Engineer ; 164 , n 4251
1937
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of southern railway to Portsmouth
Engineering Index Backfile | 1937
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938