Scheme involves 75 route mi and 165 track mi now operated electrically; electrification carried out on 600-v d-c third-rail system; total of 292 vehicles provided for operation of newly electrified lines. (see also Engineer v 166 n 4303 July 1 1938 p 7-9)
Southern railway electrification to Portsmouth via Horsham
Engineering
Engineering ; 146 , n 3781
1938
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Electrification of southern railway to Portsmouth
Engineering Index Backfile | 1937
Electrification of southern railway to Portsmouth
Engineering Index Backfile | 1937