Shortly before "D" day it was anticipated that large number of landing craft and other vessels would suffer damage during landing; it was necessary for provision to be made for these craft to be repaired on spot by means of floating docks; author describes manner in which docks were built in reinforced concrete at rate of one every 4 weeks.
Concrete floating docks
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 67 , n 11
1946
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1925
|Engineering Index Backfile | 1902
Engineering Index Backfile | 1922
|Engineering Index Backfile | 1908
|Engineering Index Backfile | 1908
|