Latest Werkspoor installation is designed to achieve minimum fuel consumption, operation by 1 person, low repair and maintenance costs and small space and weight for minimum first cost, without applying new, untested designs; with plant for 90,000-ton dw tanker, length of engine room has been shortened by at least 8 frame spaces mainly because boiler is arranged above main turbines of Werkspoor-Pametrade design with secondary gear set arranged on horizontal shaft centers; steam conditions chosen are 1000 psi and 1000 F at superheater outlet; specific fuel rate of cycle is 0.428 lb/shp-hr; arrangement is shown in plan and design of components is described. (See also n 1061 Aug 1964 p 378-82, n 1062 Sept p 426-8)
Werkspoor advanced turbine plant
Mar Engr Naval Architect
Marine Engineer and Naval Architect ; 87 , n 1061-1062
1964
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Werkspoor advanced turbine plant
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1957
Stork Werkspoor demonstriert Optimismus
Kraftfahrwesen | 1979
|Engineering Index Backfile | 1957