Two interlockings eliminated; delays shortened; running time reduced; savings of 19 per cent; track and signal plan of centralized traffic control territory between Red Oak and Balfour. (see also Ry. Signaling, vol. 23, no. 9, Sept. 1930, pp. 318-322, 8 figs)
Burlington installs centralized traffic control on 24 miles of single track
Ry. Age
Railway Age ; 89 , n 9
1930
4 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Pennsylvania installs centralized traffic control on 30.3 miles of single track
Engineering Index Backfile | 1931
Pennsylvania installs centralized control on 30.3 miles of single track
Engineering Index Backfile | 1930
Missouri pacific installs centralized traffic control on 32 miles of double track
Engineering Index Backfile | 1931
Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|