Either-direction operation on each track and elimination of train orders facilitate operation; experience with centralized control; track and signal plan of territory controlled from Pacific; method of operation; power-supply system; results obtained.
Missouri pacific installs centralized traffic control on 32 miles of double track
Ry. Signaling
Railway Signaling ; 24 , n 6 ; p 206-208
1931
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
Missouri pacific installs C.T.C. on 34 miles
Engineering Index Backfile | 1937
Missouri pacific installs C.T.C. on 34 miles
Engineering Index Backfile | 1937
Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|