Construction project to modernize Belgian canal is described; to eliminate 28 locks, single inclined plane is built to raise or lower 1300-ton canal boats 223 ft vertically, moving them in 5000-ton tank of water; tank moves on rails on heavily built concrete trough that also accommodates counterweights; to keep incline in plane, excavation 100 ft deep and support for canal and transfer car are required.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Belgian 223-ft barge lift keeps vessels afloat on inclined railway


    Weitere Titelangaben:

    Civ Eng (NY)


    Beteiligte:
    Huckerby, J.K. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1964


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :