Problems connected with acquisition of materials required for overhaul works on railroad vehicles are discussed; case where each vehicle is required to cover given kilometrage between overhauls, and where monthly kilometrage of each vehicle is random variable with known statistical characteristics and case where dispatch of vehicle to workshops depends on damages suffered, are examined; using given table, it is possible to determine probable volume of works to be carried out within given period of time.
Preparing overhaul programmes for railway vehicles
Int Ry Congress Assn -- Monthly Bul
1964
13 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Belgium in (USD)1 bn defence overhaul . R-R targets US DoD programmes
Online Contents | 2002
Railway wagon overhaul anti-collision device and transfer tool thereof
Europäisches Patentamt | 2023
|