Problems connected with acquisition of materials required for overhaul works on railroad vehicles are discussed; case where each vehicle is required to cover given kilometrage between overhauls, and where monthly kilometrage of each vehicle is random variable with known statistical characteristics and case where dispatch of vehicle to workshops depends on damages suffered, are examined; using given table, it is possible to determine probable volume of works to be carried out within given period of time.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Preparing overhaul programmes for railway vehicles


    Weitere Titelangaben:

    Int Ry Congress Assn -- Monthly Bul


    Beteiligte:
    Buretier, P. (Autor:in)


    Erscheinungsdatum :

    1964


    Format / Umfang :

    13 pages


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Railway locomotive overhaul platform

    WEI LAI | Europäisches Patentamt | 2015

    Freier Zugriff

    A railway overhaul works

    Engineering Index Backfile | 1928


    Railway train overhaul system

    WEI LAI | Europäisches Patentamt | 2015

    Freier Zugriff


    Railway wagon overhaul anti-collision device and transfer tool thereof

    SHEN GUANGSHENG / TIAN NA / LIU CHUNHUI et al. | Europäisches Patentamt | 2023

    Freier Zugriff