Layout and equipment of Crewe Works established in 1843, for repairing locomotive stock of Grand Junction Ry.; in layout of reorganized works, use of shops was rearranged so as to eliminate transport wherever possible, and machines were installed so as to permit manufacture and repair of component parts to progress process by process; details of machine shops; engine-erecting frames; boiler-repair shops; steel works. Paper read before Instn. Mech. Engrs. (See also Instn. Mech. Engrs. -- Proc., no. 2, 1928, pp. 245-263 and (discussion) p 263-288, 13 figs.; Engineer, vol. 145, no. 3767, Mar. 23, 1928, pp. 314-318, 11 figs.; Int. Ry. Congress Assn. -- Bul., vol. 10, no. 8, Aug. 1928, pp. 665-677 and (discussion) p 678-679, 11 figs.; Ry. Engr., vol. 49, no. 580, May 1928, pp. 161-162 and 192, 2 figs., and Ry. Gaz., vol. 48, no. 12, Mar. 23, 1928, pp. 395-400 and (discussion) p 434, 11 figs.)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The reorganization of Crewe Locomotive Works


    Weitere Titelangaben:

    Engineering


    Beteiligte:
    Beames, H.P.M. (Autor:in)

    Erschienen in:

    Engineering ; 125 , n 3245


    Erscheinungsdatum :

    1928


    Format / Umfang :

    5 pages


    Anmerkungen:

    11 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928