On very busy section new signaling enables additional electric trains to be operated, and also permits steam passenger and freight trains ot be worked as required on electric lines; number of special features are incorporated; track layout and connections; steam and electric traffic conditions; power supply and distribution; fog repeaters; track circuits and overlaps; approach and route locking; train stops and proving; detection and telephones. See editorial comment on p. 226 of same journal.
Semi-automatic signalling on the bromley-barking section of the L.M.S.R.
Ry. Gaz
Railway Gazette and Railway News ; 49 , n 8
1928
17 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Automatic train control on L.M.S.R
Engineering Index Backfile | 1938
Automatic train control on L.M.S.R
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Resignalling at coleraine, L.M.S.R. (N.C.C. section)
Engineering Index Backfile | 1939