Westbound yard at Selkirk is made up of receiving yard of 15 tracks, classification yard of 25 tracks, and advance yard of 15 tracks; prior to installation of car retarders, car riders were used and switches were operated by General Railway Signal Co.; electric switch movements; retarders controlled from three towers; electrically operated; floodlights for carrider operation for operators in observing car numbers and speeds.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Car retarders at Selkirk yard


    Weitere Titelangaben:

    Int. Ry. Congress Assn. -- Bul


    Beteiligte:
    Elsworth, R.B. (Autor:in)


    Erscheinungsdatum :

    1928


    Format / Umfang :

    5 pages


    Anmerkungen:

    1 Fig.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Car retarders at Selkirk yard

    Elsworth, R.B. | Engineering Index Backfile | 1928


    Car retarders at Selkirk yard

    Elsworth, R.B. | Engineering Index Backfile | 1928


    Erie installs retarders in Marion Yard

    Engineering Index Backfile | 1931


    Weight-compensated retarders at Bloemfontein yard

    Engineering Index Backfile | 1966


    Erie installs retarders in Marion Yard

    Engineering Index Backfile | 1931