Description of Diesel electric grid system installed in plant of Pedro de Valdivia, which is owned and operated by Lautaro Nitrate Co, Ltd, about 100 mi north of port of Antofagasta, Chile; power house contains five 4700-hp double acting 2-cycle air injection, MAN Diesel engine generators, which produce power at 60 cycles and 6600 v; about 20 mi north of plant is similar plant called "Maria Elena," which has Diesel engine power house with 24,000-hp installed capacity.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New diesel for Chilean nitrate industry


    Weitere Titelangaben:

    Diesel Progress


    Beteiligte:
    Ruegger, C.J. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1948


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Chilean navy diesel auxiliary barkentine, Lautaro

    Fullerton, W.H. | Engineering Index Backfile | 1943


    "Chilean reefer"

    Engineering Index Backfile | 1959


    Giant diesel plant for nitrate works

    Engineering Index Backfile | 1930


    Chilean 230

    Online Contents | 1994


    Chilean Airscene

    Online Contents | 1996