Problems and solutions for transporting extremely heavy equipment for power plant that is major feature of Bureau of Reclamation's Columbia Basin Project in Washington; permanent handling equipment to lift and convey 2000-ton rotors for 600,000kw generators, 500-ton turbine runners, and other large and heavy equipment components within power plant; railways carry loads to 300 tons, provided clearance requirements can be met; oversize components are transported on special trucks or by combination of barges and special land equipment; investigation was conducted to determine adequacy of bridge spanning existing spillway to carry loads to 350 tons. (02101)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Transporting equipment for Grand Coulee third plant


    Weitere Titelangaben:

    ASCE J Power Div


    Beteiligte:
    Arthur, H.G. (Autor:in)


    Erscheinungsdatum :

    1968


    Format / Umfang :

    17 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch