Before-and-after study was performed on ramp ending with stop sign and at ramp's intersection with one-way roadway; speeds and lags for day and night conditions were measured before and after ramp was paved red; four pneumatic tubes were placed on ramp at various distances from stop line; ramp traffic was registered on 20-pen recorder; speeds were computed using difference in time and distances between tubes; average speeds were determined for points 100, 200, and 318 ft from stop line.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Red colored pavement


    Weitere Titelangaben:

    Nat Research Council -- Highway Research Board -- Research Rec


    Beteiligte:
    Gwynn, D.W. (Autor:in) / Seifert, J. (Autor:in)


    Erscheinungsdatum :

    1968


    Format / Umfang :

    8 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch