Track construction and organization of permanent-way work, traffic development, and training of men in Japan; track construction; flat-bottomed rails are mostly 60 lb., 75 lb., and 100 lb.; ties are mostly of timber; organization of permanent-way work; river pebble adopted, somewhat resembling sand tracks in operation. Abstract of paper read before Permanent Way Instn. (see also Engineer, vol. 147, no. 3812, Feb. 1, 1929, p. 135)
Permanent way maintenance in Japan
Ry Gaz
Railway Gazette and Railway News ; 50 , n 5
1929
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Permanent way maintenance in Japan
Engineering Index Backfile | 1929
|Some aspects of permanent way maintenance in Japan
Engineering Index Backfile | 1929
|Mechanical permanent way maintenance
Engineering Index Backfile | 1934
Mechanisation of permanent way maintenance
Engineering Index Backfile | 1932
Maintenance of permanent way -- I
Engineering Index Backfile | 1919