A sustainable urban transport system has become a unified part of development in any country. Public adequacy of sustainable transport measures is a challenge for developing cities such as Karachi, where mobility to all income groups of the society needs to be ensured without affecting Travel Time, Cost, and Environmental stability. A process of stratified sampling and detailed survey has been carried out to examine public attitudes towards transit system execution using Statistical Package for Social Sciences (SPSS) tool, which enables to assess relevant performance parameters according to the Bus Rapid Transit (BRT) system implementation and judge public opinion to shift from private vehicle to BRT. This paper investigates a comprehensive analysis of Public Perception regarding to the prospects of Bus Rapid Transit (BRT) system at Corridor III Karachi.
Engineering Analysis of Bus Rapid Transit (BRT) systems at Corridor III Karachi.
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Freeway and rapid transit share corridor
Engineering Index Backfile | 1968
|Willingness to Shift towards Biogas-fueled Bus Rapid Transit in Karachi, Pakistan
Springer Verlag | 2024
|Ridership estimation procedure for a transit corridor with new bus rapid transit service
Online Contents | 2016
|Corridor upgrade cuts transit times
British Library Online Contents | 1999
Private Link Completes Transit Corridor
British Library Online Contents | 1994